Photos from Plishner radio telescope site work trip October 7, 2017

Main efforts on this work trip were:

  1. Testing by Ed Johnson, Ray Uberecken, and Bill Miller, of the system II dish motor controller and software.
  2. Checking ability of the the 1.2 – 1.4 GHz feed to receive.
  3. Completion of Phase 1 of the bunker ramp retaining wall, by Ed Corn and Steve Plock. The wall is now 8 blocks high.

Also during the day, Gary Agranat represented DSES at the community fair in town, the Haswell Bazaar.

For more details, see the 2017-10-09 DSES Technical Planning Meeting Minutes.

AD5MQ, Ray Uberecken AA0L and Bill Miller KC0FHN testing the System 2 pointing system. They also listened for 1.296 GHz and 430 MHz beacons to test reception.

More work on the new retaining wall for the bunker ramp, by Ed Corn KC0TBE and Steve Plock KL7IZW.

The condition of the remainder of the south side of the bunker ramp.

Site generator building and propane tank.
After testing the antenna pointing system, the 60 foot dish antenna was again pointed a few degrees north to scan for Cygnus A and for galactic neutral hydrogen.