Fiber Cable Installation

These are photos, shared by Steve Plock, from the installation of the 100 meter fiber optic cable during the first week of March. The new cable runs from the antenna feed to the com trailer, and replaces a coax cable. A 50-foot lift was rented, to run the cable to the antenna feed. Ed Corn worked from the lift bucket.

The installation was originally scheduled for Monday March 5th, but the winds were too strong. The winds were not as strong the next day, though still a challenge, and they did the installation then.

The fiber optic cable enables a higher data rate, and also eliminates a significant source of noise.

Skip Crilly, Monday March 5, 2018.
Ed Corn working from the bucket. Tuesday March 6, 2018.
Ed working from the bucket, with Floyd Glick and Bill Miller watching on the ground. Tuesday March 6, 2018. Also present were Glenn Davis and Paul Berge.