Telescope site trip report for Saturday July 29, 2018

Work trip report by Bill Miller.

On Saturday July 29th Dave Molter, Rich Russel, Steve Plock, Ed Corn, Michael and Gail Lowe, and Bill Miller went to the Plishner telescope site and did the following:
1. Steve, Ed, Bill, Dave, Michael, Steve and three women volunteers from Las Animas  cleaned all of the scrap metal, wood and unused tech equipment out of the bunker, and loaded as scrap onto Ed’s trailer.
2. They also cleaned out the scrap from the pedestal and in front of the new outhouse.
3. Dave and Ed both took full trailer loads of scrap back to Colorado springs for salvage.
4. Rich brought his lawn tractor and mowed all the grass and weeds along the road and in the open space, AKA the Diane Uberecken Memorial Park area around the dish.
5. Dave and Bill unloaded about 700 lbs of concrete and sand that Dave brought into the bunker, for use on rebuilding the retaining wall.
6. Ed wired up the breaker panel in the outhouse and attached the RV outlet wires.
7. Steve installed the RV outlet pedestals by driving steel fence posts and attaching the outlets.
8. Dave cleaned out the bottom of the bunker ramp and worked on some of the retaining wall.
9. Bill measured and accessed the installation for the elevation synchro wires and liquid-tight conduit from the upper deck to the control deck of the pedestal.